1 Proposed Seelong Sanitary Landfill
- Amenities Buildings
Hock Keong Metal Works 600,000.00 28.07.2003 14.12.2003
2 Proposed Seelong Sanitary Landfill
- TNB Sub-station
Hock Keong Metal Works 130,000.00 23.09.2003 26.10.2003
3 Proposed Execution and Completion of Main Access Road at Devon Palm Oil Mill at Malacca Ching & Yap Enterprise 795,000.00 16.10.2003 22.01.2004
4 Proposed Upgrading Works for the Existing Palm Oil Mill from 30 Mt - 60 Mt at Lot PTD 525, Batu 10, Jalan Labis, Daerah Segamat, Mukim Sungai Segamat, Johor D.T. for Stable Win Sdn Bhd
- Main Building Works
Meng Seng Hup Kee Engineering Sdn Bhd 480,000.00 31.12.2003 15.06.2004
5 Proposed Single Storey Factory at Lot PTD 525 Batu 10, Jalan Labis, Daerah Segamat, Mukim Sungai Segamat, Johor D.T. for Ecologico Packaging Sdn Bhd
- Earthwork, Piling Works, Main Building Works & Infrastructure Works
view photo
Meng Seng Hup Kee Engineering Sdn Bhd 2,000,000.00 22.12.2003 15.09.2004
6 Proposed Construction, Completion & Guarantee of Mill Sterilization, Kernel Plant and upgrading at Lian Hup Palm Oil Mill for Harn Len Corporation Bhd
- Earthwork, Piling Works, Main Building Works & Infrastructure Works
Meng Seng Hup Kee Engineering Sdn Bhd 400,000.00 01.05.2004 31.03.2005
7 Cadangan Pembangunan Tapak Pelupusan Sampah Sanitari Di Mukim Senai-Kulai, Daerah Johor Bahru, Johor D.T.
- Maintenance Workshop & Ancillary Works
Megature Construction Sdn Bhd 757,208.35 23.08.2004 23.03.2005
8 Construction And Completion of Earthworks and Infrastructure Works for Layang Mill at Johor
- Site Clearing, Earthworks & Infrastructure Works
view photo
Sime Plantations Sdn. Bhd. 3,147,150.00 08.11.2004 11.07.2005
9 Construction And Completion of Civil and Structural Works for Layang Mill
- Civil Engineering & Buildings Work
Sime Plantations Sdn. Bhd. 6,980,553.03 25.07.2005 29.06.2006
10 Construction & Completion Of R.C. Base Of Retaining Wall & Earthworks For Proposed Design & Build An Average 10M Height Retaining Wall Along Commercial Land For Tesco Project, Taman Desa Tebrau, Mukim Tebrau, Daerah Johor Bahru, Johor Darul Takzim For M/s Heng Guan Soon Piling Construction Sdn. Bhd. 491,000.00 06.07.2006 05.01.2007
11 Construction And Completion Of Proposed 5 Units Three Storey Shophouse For
1. HSD 1908, LOT 3346, For : Mr. Tan Kee Heng & Ms. Chu Lan Hiang
2. HSD 1967, LOT 3347, For : Mr. Loh Yeong Heng
3. HSD 6574--LOT 1972, For : Mr. Tay Yong Hwa
4. HSD 2815--LOT 4434 (SH116), For : Mr. Lee Beng Hock, Ms. Lee Mei Huay, Ms. Lee Mei Na
5. HSD 2069 (SH117) PTD 3348, For : Mr. Tan Chai Huat

1. Mr. Tan Kee Heng & Ms. Chu Lan Hiang
2. Mr. Loh Yeong Heng
3. Mr. Tay Yong Hwa
4. Mr. Lee Beng Hock, Ms. Lee Mei Huay, Ms. Lee Mei Na
5. Mr. Tan Chai Huat

224,097.00
199,160.00
193,121.00
199,124.00
200,748.00
21.04.2006 20.06.2007
12 Proposed And Construction Of Three (3) Units Anaerobic Pond At Sedenak Palm Oil Mill, Sedenak, Johor. EPA Management Sdn. Bhd. 371,990.00 03.05.2007 02.09.2007
13 To Construct Schedule Waste Store For Sedenak Palm Oil Mill EPA Management Sdn. Bhd. 23,000.00 06.09.2007 30.09.2007
14 Proposed Pilecaps Works For Commercial Development Consist Of 194 Units Shop, 194 Units Office, 1088 Units Apartment, 1 Block Multi Storey Parking Building & Recreation Centre On Lot PTD 128468, PTD 128469, PTD 128470 & PTD 128472, Taman Desa Tebrau, Muki Heng Guan Soon Piling Construction Sdn. Bhd. 3,200,000.00 01.11.2006 31.10.2007
15 Cadangan Mendirikan Sebuah Bungalow 2 1/2 Tingkat Di Atas HS(M) 4199, PTD 9715, Jalan Sawah, Pekan Nanas, Mukim Jerakm Baru, Daerah Pontian Mr. Lee Chong Meng & Mr. Lee Wai Siong 700,155.00 28.05.2007 31.12.2007
16 Proposed Construction And Completion Of 1 Unit Chemical Store And 1 Unit Workshop At Ladang Bukit Layang, Sungai Tiram, Johor. EPA Management Sdn. Bhd. 54,000.00 03.12.2007 04.01.2008
17 Fabricate, Install And Commissioning Of One Unit 15000 Gallon Treated Water Tank Holding At Siang Palm Oil Mill, Kota Tinggi, Johor EPA Management Sdn. Bhd. 46,000.00 21.01.2008 20.02.2008
18 HQ : Seelong Cell 1 Closure Works and Landfill Gas Project, Cascading Surface Rub Off Drain SWM Resources Sdn Bhd 46,273.63 07.12.2007 07.01.2008
19 Proposed Curved M.S Shed And PVC Coated Fencing For Landfill Gas Flare At Seelong Environmental Centre SWM Resources Sdn Bhd 23,575.00 07.03.2008 17.03.2008
20 Construction And Completion Of Earthwork, Civil And Structural Works For Gunung Mas Mill, Johor.
view photo
Sime Plantations Sdn. Bhd. 11,203,065.00 01.06.2006 31.03.2008
21 Pembangunan Tapak Pelupusan Smapah Sanitari Di Seelong, Mukim Senai-Kulai, Daerah Johor Bahru, Johor Darul Takzim Phase 2 : Cell 2 and Cell 3
Contract No. 6 : Construct And Complete Education Centre Building, Transfer Station And Ancillary Work
LGB Engineering Sdn. Bhd. 2,474,604.34 13.08.2007 31.03.2008
22 Pembangunan Tapak Pelupusan Smapah Sanitari Di Seelong, Mukim Senai-Kulai, Daerah Johor Bahru, Johor Darul Takzim Phase 2 : Cell 2 and Cell 3
Contract No. 3 : Road And Drainage Works
LGB Engineering Sdn. Bhd. 813,484.65 15.12.2007 15.04.2008
23 Proposed Construction And Completion Of 1 Unit Bin Centre, Pump House, Nusery Store And Nusery Shedes At Tissue Culture Laboratory, Ladang Rem, Kota Tinggi. EPA Management Sdn. Bhd. 240,000.00 07.01.2008 15.04.2008
24 Proposed Construction Of One Unit 45 Tonne Capacity ( 3x15 Tonne Per Bay ) Steel Loading Ramp At Ladang Labis Bahru, Segamat, Johor. EPA Management Sdn. Bhd. 160,435.00 21.03.2008 20.05.2008
25 Clearing Plams For New Nursery Site At Ladang Basir Ismail, Kota Tinggi, Johor. EPA Management Sdn. Bhd. 29,345.00 27.03.2008 26.04.2008
26 Turfing Works For Cell 1 At Seelong Landfill To Supply And Plant Spot Turfing To Existing Earth Slope SWM Resources Sdn Bhd 45,000.00 28.01.2008 25.04.2008
27 Renewal Of Rail Tracks At Striliser No 1 & 3 At Siang Palm Oil Mill, Kota Tinggi, Johor EPA Management Sdn. Bhd. 66,848.00 18.06.2008 02.07.2008
28 Civil & Structural Works For Proposed Kilang Kelapa Sawit Ladang Rakyat Trengganu, Cheneh Baru, Kemaman, Terengganu. Ladang Rakyat Trengganu Sdn. Bhd. 5,817,142.00 09.07.2007 15.09.2008
29 Desilting Of Anaerobic Pond At Siang Palm Oil Mill, Kota Tinggi, Johor EPA Management Sdn. Bhd. 107,000.00 16.06.2008 25.08.2008
30 Desilting Of Anaerobic Pond At Palong Cocoa Palm Oil Mill, Segamat, Johor EPA Management Sdn. Bhd. 79,000.00 26.06.2008 01.09.2008
31 Proposed Construction And Completion Of New Spillway And Bund Repair Works At Ladang Basir Ismail, Sungai Tiram EPA Management Sdn. Bhd. 128,296.00 05.08.2008 04.10 2008
32 Proposed Construction of Oil Mill Platform Effluent Pond, Water Reservoir, Access Road And Associated Works for ELPHIL Oil Mill Mukim Pulau Kamiri Kuala Kangsa, Perak Sime Darby Plantation Sdn Bhd 1,856,168.00 08.08.2008 18.12.2008
33 Repair Water Reservoir's Bund At Ladang Bukit Kelompak, Kota Tinggi. EPA Management Sdn Bhd 119,500.00 04.02.2009 18.03.2009
34 Supply, Install, Test And Commission HDPE Pipings For Land Application At Gunung Mas Estate, Cha'ah , Johor Sime Darby Plantation Sdn Bhd 687,000.00 18.08.2008 18.12.2008
35 Construction And Completion Of 1 Unit 2 x 9 M Tonnes FFB Hopper Field Ramp At Sg Gemas Estate Gemas Negeri Sembilan . Sime Darby Plantation Sdn Bhd 209,000.00 16.02.2009 22.06.2009
36 Repair Work On Spillway At Sedenak Palm Oil Mill, Kulai, Johor. EPA Management Sdn. Bhd. 34, 000.00 8.04.2009 22.05.2009
38 Replacement Of Roofing And Purlins At Tunjuk Laut Palm Oil Mill, Kota Tinggi, Johor EPA Management Sdn. Bhd. 63,072.00 09.09.2009 08.10.2009
39 Construction And Completion Of One Unit Contractor's Workshop At Ladang Palong , Segamat. EPA Management Sdn. Bhd 48,917.80 15.10.2009 30.11.2009
40 Permohonan Plan Bangunan Bagi Cadangan Pembangunan Fasa 7 Ke Atas Kemudahan Kilang Minyak Di Atas PLO 519 ( PTD 127540 ) Jalan Besi Satu.
view photo
Carotino Sdn Bhd 5,007,223.65 5.10.2009 19.04.2010
41 Proposed upgrading Of Fertiliser Store At Ladang Mungka, Segamat, Johor. EPA Management Sdn. Bhd 28, 000.00 26.10.2009 25.12.2009
42 Construction & Completion Of One Unit Fertiliser Store at Cenas Estate, Bandar Tenggara, Johor Sime Darby Plantation Sdn Bhd 87,305.00 25.11.2009 25.05.2010
43 Construction & Completion Of One Unit Fertiliser Store at Lambak Estate, Kluang, Johor Sime Darby Plantation Sdn Bhd 106, 505.00 25.11.2009 25.05.2010
44 Construction And Completion Of Two Units 100 Tons Capacity Each Fertiliser Store At Ladang Siang, Kota Tinggi. EPA Management Sdn. Bhd. 192,628.50 28.09.2009 13.11.2009
45 Upgrade / Repairs Various Building For RSPO Certification At Ladang Palong, Segamat EPA Management Sdn. Bhd. 86,000.00 28.09.2009 13.11.2009
46 Upgrade / Repairs Various Building For RSPO Certification At Ladang Kemedak, Segamat EPA Management Sdn. Bhd. 60,000.00 28.09.2009 13.11.2009
47 Construction And Completion Of One Unit Contractor's Workshop At Ladang Kemedak, Segamat. EPA Management Sdn. Bhd 54,107.90 15.10.2009 30.11.2009
48 The Closure Of Existing Effluent Pond At KKS Sungai Tawing, Kluang Sime Darby Plantation Sdn Bhd 26,000.00 09.12.2009 05.01.2010
49 Proposed FFB Loading Concrete Flooring For Ulu Remis Mill, Layang-Layang,Johor
view photo
Sime Darby Plantation Sdn Bhd 131,105.00 16.03.2010 26.04.2010
50 Proposed Replacement Of New HDPE Pn 10 Effluent Piping For KKS Yong Peng Sime Darby Plantation Sdn Bhd 148,050.00 16.03.2010 10.05.2010
51 Proposed EFB Concrete Flooring For Bukit Mill, Kluang, Johor Sime Darby Plantation Sdn Bhd 87,600.00 16.03.2010 24.04.2010
52 Civil, Structure And Civil Works For New Kok Foh Oil Mill,Mukim Rompin, Daerah Jempol, Negeri Sembilan.
view photo
Sime Darby Plantation Sdn Bhd 10,273,000.00 27.03.2009 31.05.2010
53 Construction And Completion 2 Unit Assistant Manager Bungalow For Kok Foh Mill At Kok Foh Estate, Bahau. Sime Darby Plantation Sdn Bhd 415,050.00 13.05.2010 28.10.2010
54 Proposed Construction Of One Unit 20,000M3 Anaerobic Pond For Sinora Palam Oil Mill, Kluang, Johor. EPA Management Sdn. Bhd. 86,000.00 18.10.2010 17.12.2010
55 Proposed Set-up Of Integrated Natural Fertiliser System (Closed Waste Management System) For Tetuan Asia Green Solutions Sdn. Bhd. - GIRAM OIL MILL Asiagreen Solutions Sdn. Bhd. 4,263,066.40 17.05.2010 16.09.2010
56 Proposed Set-up Of Integrated Natural Fertiliser System (Closed Waste Management System) For Tetuan Asia Green Solutions Sdn. Bhd. - GUNUNG MAS OIL MILL Asiagreen Solutions Sdn. Bhd. 3,952,378.90 24.05.2010 23.09.2010
57 Proposed Set-up Of Integrated Natural Fertiliser System (Closed Waste Management System) For Tetuan Asia Green Solutions Sdn. Bhd. - HADAPAN OIL MILL Asiagreen Solutions Sdn. Bhd. 3,297,197.60 24.05.2010 23.09.2010
58 Proposed Set-up Of Integrated Natural Fertiliser System (Closed Waste Management System) For Tetuan Asia Green Solutions Sdn. Bhd. - ULU REMIS OIL MILL Asiagreen Solutions Sdn. Bhd. 3,331,460.85 24.05.2010 23.09.2010
59 Proposed Construction And Completion Of New Operation Building For Sime Darby Seed Agricultural Services, Tawau, Sabah Sime Darby Plantation Sdn Bhd 727,251.00 09.08.2010 31.10.2010
60 Construction And Completion Of 1 Unit Warehouse At Sungai Tiram. HEDGE Engineering( M ) Sdn Bhd 152,903.00 09.02.2011 09.04.2011
61 Cadangan Pembinaan 10 Unit Kilang Berkembar Dengan Pejabat 2 Tingkat Berserta Rumah Sampah Di Atas Sebahagian Lot 110488,Mukim Tebrau. Austin Heights Sdn Bhd 276,500.00 15.09.2010 15.04.2011
62 Supply,Delivery And Guarantee Of Works For Proposed Main Concrete Access Road For KKS Chaah,Chaah, Johor. Sime Darby Plantation Sdn Bhd 132,005.00 23.02.2011 09.03.2011
63 Proposed Construction And Completion of Community Hall And Upgrading Assistant Bungalow for Bkt Asahan Estate And 1 Unit Staff Bungalow For PMU Layang-Layang At Ulu Remis Estate. Sime Darby Plantation Sdn Bhd 484,499.30 03.03.2011 21.07.2011
64 Proposed Central Housing Complex At Tennamaram Estate Sime Darby Plantation Sdn Bhd 7,170,663.00 15.03.2011 15.09.2011
65 Installation work for building site (provisional fence, front gate, base camp) Lebas Technologies Malaysia 121,414.00 08.02.2012 06.03.2012
66 Proposed Single Storey Factory And 5-Storey Worker Quarter At Lot PTD 200643, Masai Industrial Park, Mukim Pelentong, Johor. Redwood Furniture Sdn Bhd 7,500,000.00 15.10.2010 15.06.2011
67 Proposed Development of "Senai Airport City" on Lot 84-87, 89-95, 97, 98, 100, 825, 1877, 3590, PTD 102255 and PTD 102256, PTD 102259, PTD 102260, PTD 102261 and PTD 102262, Mukim Senai, Daerah Kulaijaya and PTD 151375, 151376, 151379 and 151380, Mukim Tebrau Daerah Johor Bahru, Johor ("Project") Enigma Harmoni Sdn Bhd 1,382,663.00 01.01.2012 13.07.2012
68 Proposed Surfacing & Upgrading of Access Road for Sua Betong Oil Mill, Port Dickson, Negeri Sembilan Sime Darby Plantation Sdn Bhd 3,444,200.00 03.05.2012 25.10.2012
69 Proposed Construction of Concrete Road (Phase 1) for Pagoh Oil Mill, Mukim Bakri, Muar, Johor. Sime Darby Plantation Sdn Bhd 1,731,270.00 28.05.2012 12.11.2012
70 Proposed main drainage and reinforced concrete retaining wall on Lot PTD 4836, PTD 4837, Mukim Pengerang, Daerah Pengerang, Johor for M/S Pengerang Independent Terminals Sdn Bhd JBB Builders (M) Sdn Bhd 13,924,902.75 01.05.2012 28.02.2013
71 Cadangan Membina 1 Blok Rumah Pangsa Sederhana (Rumah Pekerja) 5 Tingkat (55 Unit), Di Atas Lot 46631, Jalan Cyber 14, Kawasan Perindustrian Senai IV, Mukim Senai, Daerah Kulaijaya, Johor Darul Takzim Tetuan JVC Teamwork Sdn Bhd 3,600,000.00 13.07.2012 21.03.2013
72 Cadangan Menaiktaraf Projek Tapak Pelupusan Sisa Pepejal Sanitari di Kok Foh, Jempol, Negeri Sembilan. Cypark Resources Berhad 1,102,385.00 06.08.2012 06.09.2012
73 Proposed Construction And Completion Of Premix Road At Kemuning Estate (Rumbia Division), Malacca. Sime Darby Plantation Sdn Bhd 380,050.00 31.10.2012 22.02.2013
74 Proposed Construction And Completion Of Trial Light Duty Premix Road Using 75MM Thickness ACWC At Bukit Asahan Linesite,Malacca. Sime Darby Plantation Sdn Bhd 425,500.00 31.10.2012 22.02.2013
75 Proposed Construction And Completion Of Premix Road At Pagoh Estate, Johor Sime Darby Plantation Sdn Bhd 717,500.00 31.10.2012 22.02.2013
76 Proposed Construction And Completion Of Premix Road At Kempas Estate And Merlimau Division , Malacca. Sime Darby Plantation Sdn Bhd 267,905.00 31.10.2012 25.01.2013
77 Proposed Construction And Completion Of Premix Road At Diamond Jubilee Estate, Malacca . Sime Darby Plantation Sdn Bhd 381,300.00 31.10.2012 25.01.2013
78 Proposed Construction And Completion Of Reinforce Concrete Road To KKS Kempas At Kempas Estate, Malacca. Sime Darby Plantation Sdn Bhd 2,953,700.00 31.10.2012 15.07.2013
79 Proposed Construction And Completion Of Premix Road Heavy Duty From Bukit Talang Oil Mill To Tamil School At Bukit Talang Estate, Selangor. Sime Darby Plantation Sdn Bhd 2,109,700.00 01.02.2013 15.09.2013
80 Proposed Construction And Completion Of Reinforce Concrete Road And Premix Road At West Estate, Carey Island, Selangor. Sime Darby Plantation Sdn Bhd 3,521,691.00 14.02.2013 22.10.2013
81 Proposed Construction And Completion Of Premix Road (Main Division) At Dusun Durian Estate, Selangor. Sime Darby Plantation Sdn Bhd 357,392.00 14.02.2013 07.05.2013
82 Proposed Construction And Completion Of Premix Road (Main Division) At Sepang Estate, Selangor. Sime Darby Plantation Sdn Bhd 475,368.00 14.02.2013 04.06.2013
83 Cadangan Membina Sebuah Gudang 3 Tingkat Serta Pejabat 3 1/2 Tingkat Diatas Lot PT 25948, Jalan Raja Afah 1, Segambut, Mukim Batu,Dalam Bandaraya Kuala Lumpur Evergrown Enterprise Sdn Bhd 5,243,000.00 01.03.2013 31.10.2013
84 Proposed Construction And Completion Of Premix Road At Sungai Buloh Estate, Selangor Sime Darby Plantation Sdn Bhd 1,929,811.52 01.04.2013 16.10.2013
85 Proposed Surfacing And Upgrading Of Access Road ( 2nd Phase),MISC Platform Concreting Work, Walkway And Fencing Work For Sua Betong Oil Mill, Port Dickson, Negeri Sembilan. Sime Darby Plantation Sdn Bhd 2,635,198.00 14.03.2013 31.08.2013
86 Proposed Construction And Completion Of Premix Road At East Estate,Carey Island, Selangor. Sime Darby Plantation Sdn Bhd 1,820,648.20 14.02.2013 31.01.2014
87 Proposed Construction Of Effluent Treatment Plant For Seri Intan Oil Mill Sime Darby Plantation Sdn Bhd 2,152,610.00 18.07.2013 31.03.2014
88 Proposed Concrete Surfacing Work At Tennamaram Oil Mill, Bestari Jaya, Selangor Sime Darby Plantation Sdn Bhd 411, 875.00 13.09.2013 24.01.2014
89 Repair Transfer Station Floor Rectification Works To Existing Concrete Slab At Seelong Transfer Station. SWM Environment Sdn Bhd 190,150.00 02.07.2014 28.07.2014
90 Installation And Connection of Water Supply From Syarikat Air Johor For Ulu Remis Estate, Johor. Sime Darby Plantation Sdn Bhd 1,271,401.00 10.03.2014 30.09.2014
91 Proposed Upgrading Existing Boundry Fencing. Soka Gakkai Malaysia (Johor) 331,250.00 25.08.2014 30.10.2014
92 Upgrading For Kluang Office At Depoh Kluang Edaran SWM Sdn Bhd 35,988.00 02.12.2014 31.12.2014
93 Proposed Construction And Completion Of Concrete Road (Phase 2) For Pagoh Oil Mill,Mukim Jalan Bakri, Muar, Johor Sime Darby Plantation Sdn Bhd 9,750,000.00 08.05.2014 15.01.2015
94 RC Work And External Works for Blasting Painting Workshop Malaysia Marine And Heavy Engineering S/B (MMHE) 6,160,810.60 02.01.2014 15.04.2015
95 Proposed Development Of "Senai AirPort City" On Lot 84-87, 89-95, 97,98,100, 825,1877, 3590, PTD102255 And 151380, Mukim Tebrau, Dareah Johor Bahru
Environment Control (Variation Oder)
MMC Engineering Services Sdn Bhd 4,057,385.80
865,500.00
09.05.2014
10.12.2014
30.04.2015
96 Proposed New Boiler House At KKS Chaah , Chaah, Johor Darul Takzim. Sime Darby Plantation Sdn Bhd 650,000.00 30.07.2014 31.03.2015
97 Upgrading Works to Taruka Transfer Station at Tampoi SWM Enviro Sdn Bhd 219,000.00 15.03.2015 16.07.2015
98 The Proposed Implementation the District Cooling System ("DCS") at Pagoh Education Hub, Daerah Muar, Johor IAQ Resources (M) Sdn Bhd 230,594.90 01.04.2015 16.07.2015
99 RC Works For Upgrading Jacking Foundation at MMHE East Malaysia Marine And Heavy Engineering Sdn Bhd (MMHE) 854,889.00 24.12.2014 23.06.2015
100 PCP LABOUR ACCOMODATION CAMP Rapid, Pengerang, Johor Dynaciate Construction Sdn Bhd 1,249,148.00 25.10.2015 30.03.2016
101 The Proposed Implementation the District Cooling System ("DCS") Plant in Pagoh Higher Education Hub on PTD 14434, Pagoh, Muar, Johor IAQ Resources (M) Sdn Bhd 1,325,000.00 01.12.2015 31.01.2016
102 Permohonan Pelan Bangunan Di Bawah Akta 133 Bagi Cadangan Membina 1 Block Pusat Perkhidmatan Asrama Pekerja 5 Tingkat i)107 Unit Surau Lelaki, 1 Unit Surau Perempuan ,1 Unit Gerai, 1 Unit Bilik "MSB" dan 1 Unit Pondok Pengawal. ii)1 Unit Pondok Tong Sampah Di Atas Lot 45056, Jalan Murni, Kawasan Perindustrian Murni, Mukim Senai, Daerah Kulaijaya Johor .
view photo
JVC Century Sdn Bhd 7,699,457.55 15.11.2014 31.05.2016
103 Proposed Construction of 18m x 30m Storage yard and 30m x 57m Workshop IAQ Solutions Sdn Bhd 919,020.00 26.02.2016 26.05.2016
104 Goliath Creanes for FAB 4 & 5 (Phase 1)
view photo
Malaysia Marine And Heavy Engineering Sdn Bhd (MMHE) 4,543,005.48 27.10.2014 30.11.2016
105 LNG Regasification Facilities at Pengerang, Johor (RGT-2 Terminal) Project
-Building Works -
view photo
Samsung C&T Corporation USD 3,476,000.00 11.11.2015 30.03.2017
106 To Construct and Complte The Outstanding Works of a Landfill Located at Ladang CEP 1, Daerah Simpang Renggam, Negeri Johor SWM ENVIRONMENT SDN BHD 2,282,000.00 27.12.2016 26.05.2017
107 Dismantling & re-erection of CPW Workshop Malaysia Marine And Heavy Engineering Sdn Bhd (MMHE) 3,472,088.00 19.06.2017 31.01.2019
108 Proposed Construction and Completion of Melaka 2,242 MW CCGT Power Plant Project DYNACIATE ENGINEERING SDN BHD 19,649,696.15 08.06.2018 07.02.2019
109 Reinforced Concrete Road Malaysia Marine And Heavy Engineering Sdn Bhd (MMHE) 73,688.65 16.07.2018 28.07.2018
110 Civil and Structural, Mechanical and Electrical Works for Proposed Tissue Culture Lab, Renovation of Existing Building and Other Related Works on Lot Part of PTD 1098, Mukim Hulu Sg Johor, Bandar Tenggara, Johor (the "Works") Tradewinds Plantation management Sdn Bhd 4,700,000.00 11.12.2018 09.10.2019
111 Concrete Slab & Shelter Storage Tank SWM Greentech Sdn Bhd 215,016.00 15.04.2019 14.07.2019
112 EPCC Of Pengerang Centralised Tankage Facilities(PCTF) At pengerang, Johor.
view photo
Dialog E & C Sdn Bhd
32,245,135.46
23.9.2019 31.01.2021
113 Supply, Fabricate and install Keel Blocks at Masai, Johor Malaysia Marine And Heavy Engineering Sdn Bhd 1,088,000.00 02.09.2019 01.03.2020
114 Road Repair at Jalan MMHE 1& 7, MMHE Pasir Gudang, Johor. Malaysia Marine And Heavy Engineering Sdn Bhd 263,833.50 06.09.2019 30.12.2019
115 Proposed U Drain And Pre-Feb Drain at Skid Track, fabrication Area No.4 Malaysia Marine And Heavy Engineering Sdn Bhd 495,583.20 23.09.2019 05.02.2020
116 Proposed U Drain at Skid Track Area No.6 Malaysia Marine And Heavy Engineering Sdn Bhd 50,170.00 19.11.2019 30.12.2019
117 Upgrading Road And Loading Parking At Refined Sugar  MSM Sugar Refinery (JOHOR) Sdn Bhd  343,548.00 19.08.2021 18.12.2021
118 Tiling @MSB Smart Glass Reinstallation ADB, Pengerang  Dialog E & C Sdn Bhd  188,314.00 13.10.2021 16.11.2021
119 Skid Track Widening  For Jerun  At Fabrication Area  No. 5-C&S Works Malaysia Marine And Heavy Engineering Sdn Bhd  548,412.46 15.12.2021 15.02.2022
120 Proposed P12 Poly Septic Tank To Existing Semi-Detached Quaters For Jernih Kemboja Palm Oil Mill, Tenang, Labis, Johor. Jernih Kemboja Sdn Bhd  54,600.00 15.02.2022 15.04.2022
121 Proposed RC Loading Ramp For Jernih Kemboja Palm Oil Mill, Tenang Segamat, Johor. Jernih Kemboja Sdn Bhd  950,000.00 15.04.2022 14.08.2022
122 RC Piling Works For Sterilizer Foundation Of Jernih Kemboja Palm Oil Mill, Kulai. Jernih Kemboja Sdn Bhd  106,296.00 01.09.2022 31.10.2022
123 Construction For Topping Up Existing RC Liading Ramp 31M X 57M At For Jernih Kemboja Palm Oil Mill, Tenang Segamat, Johor, Jernih Kemboja Sdn Bhd  215,766.00 01.09.2022 01.11.2022
124 Proposed RC Foundation For Line 1 Sterilizer Station At Jernih Kemboja Palm Oil Mil. Jernih Kemboja Sdn Bhd  477,282.24 01.11.2022 31.01.2023
125 Proposed RC Foundation for Line 2 Sterilizer Station At Jernih Kemboja Palm Oil Mill. Jernih Kemboja Sdn Bhd 397,232.64 01.11.2022

31.01.2023

126 Construction and Completion Of Upgrading Works For EFB Yard  At KKS Chaah, Johor. Sime Darby Plantation Berhad  183,196.00 15.12.2022 14.04.2023